Overload List
Name | Description | |
---|---|---|
GetAssignedResources()()() |
Iterates the list of assigned resources (unique entries) from all standard tasks within the control.
Requires that AssignmentsContent property of the task items is of type string, formatted as a list of resource names separated by commas, optionally having associated allocation percents declared between square brackets (e.g.: "John, Mary [50%], Diane [12.5%]"),
or, in case of a Schedule Chart, formatted as an optional allocation percent (e.g.: "12.5%").
(Inherited from GanttChartView.) | |
GetAssignedResources(GanttChartItem) |
Iterates the list of assignments (defined as resource names) from a specific task within the control.
Requires that AssignmentsContent property of the task item is of type string, formatted as a list of resource names separated by commas, optionally having associated allocation percents declared between square brackets (e.g.: "John, Mary [50%], Diane [12.5%]"),
or, in case of a Schedule Chart, formatted as an optional allocation percent (e.g.: "12.5%").
(Inherited from GanttChartView.) |